CasaDelGato - Images from the House of the Cat

Home > Electric Vehicle > Ford F250 EV Conversion > Assemble Motors 2

Last additions - Assemble Motors 2
100_0172.jpg
Flywheel and cluth mounted3613 viewsBolted things together, bolted on the flywheel and clutch assemblies.
Feb 13, 2009
100_0174.jpg
Motor and Transmission4226 viewsHere is the full drive assembly. Both Impulse 9 motors, transmission and transfer case.
We are going to lift it into the truck from the bottom.
Feb 13, 2009
100_0159.jpg
Getting ready to put on the Flywheel adapter2703 viewsThe Flywheel adapter is also a heated press-fit. We made sure we had spacers to keep it from going on the shaft too far.Feb 13, 2009
100_0000.jpg
1st half coupler on motor2858 viewsMounted 1/2 the coupler on the first motor.Feb 13, 2009
100_0163.jpg
Flywheel adapter is on!3779 viewsCooling it down after pressing it on to the shaft. (more like setting it on, and tapping it gently down.)
Feb 13, 2009
100_0154.jpg
Bolting coupler together3749 viewsWe hadn't realized just how difficult it was going to be to tighten the bolts holding the coupler together. It was really awkward and hard. Took 2 people. (one turning the motor, the other holding the allen wrench.)
This was compouned when we discovered another alignment problem. Turns out that the end bells of the Impulse 9 motors aren't that accurately machine. We had a 10-20 thousandths variance between them that we had to shim.
Feb 13, 2009
100_0147.jpg
2nd half coupler mounted2496 viewsMounted the other half the coupler on the other motor.Feb 13, 2009
100_0149.jpg
Putting them together3433 viewsBoth motors together! Bolted to the motor-motor mount.Feb 13, 2009
8 files on 1 page(s)